10 exam-style questions with answers and explanations, straight from our 1,030-question bank. Tap an answer to check yourself. When you're ready, take the scored version in the free practice test.
The NYC-HPBOE exam has 110 questions and runs 4 hours.
These 10 free NYC-HPBOE questions are organized by exam domain, so you can see how each part of the New York City High Pressure Boiler Operating Engineer License Written Exam blueprint is tested. Reveal the answer and explanation under each question.
Domain 1: Administration
Question 1
Boiler 2 tripped on low water at 14:20, was repaired and function-tested, and returned to service at 16:05. The original entry, "LWCO reset; boiler normal," is rejected. Which replacement creates the most complete reconstructable record?
Show answer & explanation
Correct answer: B - 14:20 - Boiler 2 low-water trip; glass 3/8 inch above low point; fuel secured; S. Patel notified at 14:22; M. Chen repaired linkage; cutoff and fuel trip tested; restart authorized by S. Patel at 16:05 - J. Rivera
Question 2
At comparable steam load and excess oxygen, the operating log shows stack temperature rising from 430°F to 495°F over three weeks. Carbon monoxide remains normal and no alarm has occurred. Which investigation sequence is most appropriate?
Show answer & explanation
Correct answer: C - Verify the instruments, then inspect fireside fouling, sootblowing, and combustion
Question 3
During an outage, inspection reveals clusters of deep, sharply localized pits in economizer inlet tubes. Hard scale is absent, and the deaerator has been operating with inadequate venting. Which damage mechanism best fits the evidence?
Show answer & explanation
Correct answer: D - Dissolved-oxygen corrosion caused by poor gas removal
Question 4
A defect cited during a high-pressure boiler inspection is corrected within the required 90-day period. Which filing action completes ordinary closeout?
Show answer & explanation
Correct answer: A - File the subsequent report within 14 days after the correction
Domain 2: Inspection and Testing
Question 5
A new 4-inch high-pressure steam branch has a design pressure of 125 psig. Unless the responsible engineer obtains the permitted written waiver, which fabrication and examination combination applies?
Show answer & explanation
Correct answer: D - Butt-welded construction with 10% random radiography
Question 6
A boiler safety valve is set at 200 psig. The steam-pressure gauge should read to approximately twice that setting and may not have a range below 1.5 times the setting. Select the most appropriate available gauge.
Show answer & explanation
Correct answer: B - 0 to 400 psig
Domain 3: Operation and Maintenance
Question 7
A firing boiler shows no water in the gauge glass, and the pressure parts may already be overheated. The feed pump is available. Which response best limits the immediate hazard?
Show answer & explanation
Correct answer: A - Trip the fuel, do not add water, and begin controlled isolation and cooling
Question 8
A centrifugal feedwater pump develops gravel-like noise, vibration, and falling discharge head after deaerator level falls and water temperature rises. Which action addresses the underlying hydraulic condition rather than only the symptom?
Show answer & explanation
Correct answer: D - Protect boiler level; restore deaerator level, reduce suction losses, and unload the pump
Domain 4: Repairs and Alterations
Question 9
Two shell courses have TS = 55,000 psi, inside radius = 24 inches, and safety factor = 5. Course A has t = 0.50 inch and E = 0.90; Course B has t = 0.42 inch and E = 0.85. The operating certificate is limited to 160 psi. Using P = (TS × t × E) ÷ (R × FS), what is the maximum authorized operating pressure?
Show answer & explanation
Correct answer: C - 160 psi; the certificate is lower than Course B's approximately 164-psi result
Question 10
Thickness readings on an air receiver are favorable, and the owner proposes raising its authorized MAWP from 150 to 175 psi without changing any metal. How is the proposal classified?
Show answer & explanation
Correct answer: A - An alteration requiring design consideration and authorization